COVER STORY

TOM
KIRKMAN

Project Manager | Independent Project Management Professional

Understand the work. Understand the people. And do not allow unnecessary complexity to get in the way of getting the job done.

Time Travelling Duck

Electric Cow

Schrödinger's Cat

Energy Addition

TOM KIRKMAN
25+years across engineering, energy & offshore
20years working in Asia
6offshore platforms — first ValveWatch outside the North Sea
~500 tof mechanical hardware on today's refinery upgrade
4,636posts on energy, projects & Weekend Science

THE OPERATING LINE

Stop Doing Stupid Stuff.

Behind the humour is a serious management principle. Time is limited. Attention is limited. Projects are already complicated enough. Unnecessary activity should not be mistaken for progress.

01Talk to people.
02Write things down.
03Make expectations clear.
04Follow up.
05Keep a record.
06Measure whether the work is actually moving.

THE ROUTE HERE

From the farm to the refinery.

Full story →
01 · The farm

Complaining didn't get the work done.

A dairy and cash crop farm, working alongside his brothers and sisters — with humour along the way. So he learned to do it.

02 · Offshore

No room for assumptions.

On a platform, a replacement part isn't a short drive away — and personal safety can't be delegated to someone else.

03 · ValveWatch

Six platforms, South China Sea.

The first installations outside the North Sea: testing emergency shutdown valves daily without stopping flow. By the sixth, he could do most of it himself.

04 · Two decades in Asia

Plain language, or it doesn't work.

With English a second language for many on the team, acronyms needed definitions and instructions needed words people could actually use.

05 · Oilpro

Shared industry knowledge.

Years as a volunteer moderator on the forum that worked almost like an encyclopedia for oil, gas, energy and geopolitics.

06 · Today

A refinery upgrade never attempted before.

Brought in to get it back on track. New foundations, ~500 tons of hardware, controls, piping and overlapping subcontractors. He calls it a challenge — and means it.

ENERGY LITERACY

“There is no Energy Transition. There is only Energy Addition.”

The world keeps needing more energy, not simply swapping one source for another — coal use continues across Asia while reliable nuclear capacity closes in parts of the West without adequate replacement.

Energy can't be separated from reliability, cost, infrastructure, grid capacity and geopolitics.

Language is project control

The glossaries.

Over several decades, in his own time, Tom has compiled technical glossaries. Some took two or three years. He shares them with anyone who will use them.

Oil & gas hardwareElectric utility transmissionProject management
Request a glossary →
Seeing the world differently

Dyslexia as an asset.

As a child he could read words backwards, upside down and in mirror image — and assumed everyone could. Later he worked through shelves of English dictionaries to gain real control over language and thought.

“Dyslexic Project Manager who Refuses to use AI for Projects.”— his professional headline
“People are the wild card.”
On large projects, every plan depends on people interpreting it correctly.
“Leading is not the same as being a jerk about it.”
Competence earns respect. Support builds trust.
“The job is to keep moving forward without letting emotion take over when things go sideways.”
No blame game. Confront problems quickly.

Stay on target.
Get it done.
Lead well.

New posts on energy, projects and Weekend Science — straight to your inbox, without the algorithm.